Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorKüçükkoç, İbrahim
dc.contributor.authorZhang, David Z.
dc.date.accessioned2019-10-17T10:26:41Z
dc.date.available2019-10-17T10:26:41Z
dc.date.issued2015en_US
dc.identifier.issn0360-8352
dc.identifier.issn1879-0550
dc.identifier.urihttps://doi.org/10.1016/j.cie.2014.12.037
dc.identifier.urihttps://hdl.handle.net/20.500.12462/8070
dc.descriptionKüçükkoç, İbrahim (Balikesir Author)en_US
dc.description.abstractThere are many factors which affect the performance of a complex production system. Efficiency of an assembly line is one of the most important of these factors since assembly lines are generally constructed as the last stage of an entire production system. Parallel two-sided assembly line system is a new research domain in academia though these lines have been utilised to produce large sized products such as automobiles, trucks, and buses in industry for many years. Parallel two-sided assembly lines carry practical advantages of both parallel assembly lines and two-sided assembly lines. The main purpose of this paper is to introduce type-E parallel two-sided assembly line balancing probleni for the first time in the literature and to propose a new ant colony optimisation based approach for solving the problem. Different from the existing studies on parallel assembly line balancing problems in the literature, this paper aims to minimise two conflicting objectives, namely cycle time and number of work-stations at the same time and proposes a mathematical model for the formal description of the problem. To the best of our knowledge, this is the first study which addresses both conflicting objectives on a parallel two-sided assembly line configuration. The developed ant colony optimisation algorithm is illustrated with an example to explain its procedures. An experimental design is also conducted to calibrate the parameters of the proposed algorithm using response surface methodology. Results obtained from the performed computational study indicate that minimising cycle time as well as number of workstations help increase system efficiency. It is also observed that the proposed algorithm finds promising results for the studied cases of type-E parallel two-sided assembly line balancing problem when the results are compared with those obtained from other three well-known heuristics.en_US
dc.language.isoengen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.relation.isversionof10.1016/j.cie.2014.12.037en_US
dc.rightsinfo:eu-repo/semantics/embargoedAccessen_US
dc.subjectParallel Two-Sided Assembly Linesen_US
dc.subjectType-E Assembly Line Balancingen_US
dc.subjectAnt Colony Optimisationen_US
dc.subjectResponse Surface Methodologyen_US
dc.subjectArtificial Intelligenceen_US
dc.titleType-e parallel two-sided assembly line balancing problem: mathematical model and ant colony optimisation based approach with optimised parametersen_US
dc.typearticleen_US
dc.relation.journalComputers & Industrial Engineeringen_US
dc.contributor.departmentMühendislik-Mimarlık Fakültesien_US
dc.identifier.volume84en_US
dc.identifier.startpage56en_US
dc.identifier.endpage69en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster