Optimisation of boric acid production plant wastewater treatment by calcium hydroxide and advanced treatment by ion exchange

dc.authorid0000-0001-8424-6339
dc.authorid0000-0001-9499-9932
dc.contributor.authorGünay, Ahmet
dc.contributor.authorKorkmaz, Mustafa
dc.date.accessioned2026-04-02T06:26:23Z
dc.date.issued2025
dc.departmentFakülteler, Mühendislik Fakültesi, Çevre Mühendisliği Bölümü
dc.description.abstractThe Emet boric acid production plant in Türkiye produces boric acid from the reaction of colemanite (Ca2B6O11·5H2O) with sulphuric acid (H2SO4). Sulphate, arsenic (III+V) and boron are released with the plant wastewater to the wastewater dam. This study aims to treat this boric acid production plant wastewater using calcium hydroxide in a batch reactor. The concentrations of the contaminants were 3956 mg/L sulphate, 2541 mg/L boron and 36.4 mg/L total arsenic (III+V). The boron removal kinetic studies were conducted to obtain the optimum parameter intervals for the application of the central composite experimental design method to remove these contaminants. The optimum conditions in the kinetic studies for boron removal were obtained as natural wastewater pH (5.32–5.68), temperature (20 °C), stirring speed (300 rpm), calcium hydroxide dosage (15 g/L) and time (90 min). Maximum boron removal obtained from the kinetic studies was calculated as 90.7%. The kinetics of boron removal obeyed the second-order model. Sulphate, boron and arsenic removal in the optimisation studies were calculated as 23.94, 87.94 and 98.36% in optimum boron removal conditions, respectively. An ion exchange treatment was applied to the calcium hydroxide treated wastewater containing boron and sulphate residues for~100% removal.
dc.identifier.doi10.1007/s11356-025-36885-4
dc.identifier.endpage26
dc.identifier.issn0944-1344
dc.identifier.issue35
dc.identifier.pmid40889030
dc.identifier.scopus2-s2.0-105014872213
dc.identifier.scopusqualityQ1
dc.identifier.startpage1
dc.identifier.urihttps://doi.org/10.1007/s11356-025-36885-4
dc.identifier.urihttps://hdl.handle.net/20.500.12462/23622
dc.identifier.volume32
dc.indekslendigikaynakScopus
dc.indekslendigikaynakPubMed
dc.language.isoen
dc.publisherSpringer
dc.relation.ispartofEnvironmental Science and Pollution Research
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectArsenic
dc.subjectBoron
dc.subjectCalcium
dc.subjectHydroxide
dc.subjectIon
dc.subjectExchange
dc.subjectSulphate
dc.titleOptimisation of boric acid production plant wastewater treatment by calcium hydroxide and advanced treatment by ion exchange
dc.typeArticle

Dosyalar

Orijinal paket

Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
gunay-ahmet.pdf
Boyut:
2.46 MB
Biçim:
Adobe Portable Document Format

Lisans paketi

Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
license.txt
Boyut:
1.17 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama: