Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorOcaktan, Mustafa Ahmet Beyazıt
dc.contributor.authorKüçükkoç, İbrahim
dc.contributor.authorKaraoǧlan, Aslan Deniz
dc.contributor.authorCicibaş, Abdullah
dc.contributor.authorBüyüközkan, Kadir
dc.date.accessioned2019-09-10T08:13:08Z
dc.date.available2019-09-10T08:13:08Z
dc.date.issued2017en_US
dc.identifier.issn23698136
dc.identifier.urihttps://doi.org/10.11159/icmie17.118
dc.identifier.urihttps://hdl.handle.net/20.500.12462/6326
dc.descriptionOcaktan, Mustafa Ahmet Beyazıt (Balikesir Author)en_US
dc.description.abstractStochastic operation times make job-shop scheduling harder at companies which work based on project type labor-intensive production in a dynamic environment. The operation times are not known before production and change based on the orders' technical specifications. In performing required operations with the aim of producing a final product, scheduling is required for different purposes such as minimizing makespan, maximizing resource utilization, etc. This is important as it enables companies to meet customer demands by due date and reduce the labor cost on the finalized product. In this study, an order scheduling algorithm is proposed for nearly optimizing average makespan for several waiting orders in a transformer company's core production workshop considering dynamical production environment. The proposed algorithm adopts the technical order specifications, computes the stochastic operation times making use of simulation, and schedule orders using one of the widely used meta-heuristics, namely genetic algorithm. The objective is to determine the entry sequence of the waiting orders to the core production workshop for minimizing their average makespan which directly influences the resource utilization, efficiency, and labor costs.en_US
dc.language.isoengen_US
dc.publisherAvestia Publishingen_US
dc.relation.isversionof10.11159/icmie17.118en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectArenaen_US
dc.subjectGenetic Algorithmen_US
dc.subjectJob-shop Schedulingen_US
dc.subjectMakespanen_US
dc.subjectSimulationen_US
dc.titleScheduling customized orders: A case study at BEST transformers companyen_US
dc.typeconferenceObjecten_US
dc.relation.journalProceedings of the World Congress on Mechanical, Chemical, and Material Engineeringen_US
dc.contributor.departmentMühendislik Fakültesien_US
dc.contributor.authorID0000-0001-6042-6896en_US
dc.contributor.authorID0000-0002-3292-5919en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster